murphaph wrote: » Correct and this spiting of Dublin may really cost us if London based banks decide to avoid Dublin because of its very poor transport links in a post Brexit world. The jobs may stay in London depending on what happens but Dublin will be hard pressed to beat the likes of Amsterdam if a hard Brexit does come to pass.
Grandeeod wrote: » I'm quite confident that our "low tax" approach will eventually run out of steam and we will be left so far behind in terms of infrastructure, that it will matter at some point.
FACECUTTR wrote: » Building a LUAS extension from Citywest to Baldonnel and utilising a perfectly adequate 2 runway airport would make sense to me. Lots of military airports share with civilian airports. Direct link to the financial district in Dublin.
syklops wrote: The Luas is too slow anyway. Its fine for short hops, but Im not really sure why we consider extending it when the Dart is so much faster. Probably because its a cheap solution rather than a good one.
markpb wrote: » Have a look at the actual travel times for green luas and dart and see how they stack up. DMUs may be fast but DART is not.
cgcsb wrote: » Dublin's height restrictions mean that we can't build much office space.
syklops wrote: » It would make you want to cry wouldnt it? That is the core issue. The docklands could house 25000 people, and be the workplace for 25000 people. Provide better transport links and it would take the pressure off substantially. We dont even need a Chrysler building size building, just a few more floors. The average Dubliner wouldnt even notice the difference. Its depressing.
Idbatterim wrote: » the bull**** we hear trotted out is that MN and DU were planned with higher growth figures etc! Where can I find what these figures were? I would love to compare them to current figures that we have or revised ones which may be available shortly... Its easy for the politicians to lie etc, but the planners will simply give their best predictions I would imagine, you wouldn't see a real interest in them lying... busiest day ever in Dublin airport ever on Friday 24th June...
Idbatterim wrote: » the bull**** we hear trotted out is that MN and DU were planned with higher growth figures etc! Where can I find what these figures were? I would love to compare them to current figures that we have or revised ones which may be available shortly...
marno21 wrote: » Funny how city based public transport is being slimmed down to cater for lower passenger numbers yet there's a motorway (capacity of 55,000 a day) being built from Galway to Tuam and a motorway standard road being built bypassing New Ross between a city of 90,000 people and a town of 19,000
Idbatterim wrote: Also note from yesterday's news, that the fingal area is quickest growing in terms of population! It's one of the few areas in county Dublin with large amounts of land left. Build a high capacity system and you can build a lot more housing etc...
annfield1978 wrote: » Arup appointed by NTA to undertaken Tunnel/ Station Configuration Study for DART Underground/ Metro North
Idbatterim wrote: » My email sent to Alan kelly FG td on 29th June. The reply, totally ignoring two of my key questions. In fairness to him , he has given a decent enough and quick reply when I have previously emailed him. Dear Alan, I was made aware of the discussion on metro north in the Dail yesterday. I along with many others have reservations about the new scheme, in terms of sending this project back to the drawing board, but that line has been drawn under the sand it appears. So I would just ask for your opinion on mine and others largest concern? Platforms being shortened from 90m to 60m to save "€100,000,000" out of a €2,000,000,000 i.e. 5%, and you lose 33% capacity. Out of the extra €100,000,000 spend, I am sure a large amount goes directly or indirectly back to government coffers. What is the cost of extending underground stations? major, major money I am assuming and I also assume the logistics are a nightmare. Whatever about ordering less rolling stock etc, that can be easily rectified... It strikes to me, as being the single most short sighted measure I have ever heard proposed in this country and that is some statement! Just two other brief questions I have, has any thought been given to automate the line? Given that it wont be in operation until at least 2026 and our recent experience with the Luas strikes? With the amount of very early morning flights and transatlantic departures, where it is recommended you arrive 3 hours early. The current start times of the luas for example i.e 5:30am Mon - Fri, 6:30am Sat and 7am Sunday, arent much use... Also with the proposed metro south, would it now make sense to tunnel out as far as ranelagh with this revised metro north scheme? Surely you wouldnt start another section of 1km or so tunnel out to ranelagh as another project? Yours faithfully, Reply Dear X, Thank you for your email. The previous Government froze the Metro North project due to financial constraints and could not proceed with the previous incarnation due to its rising costs. The revised project has my full support and adequately links into Dublin's existing transport network, services Dublin Airport and Swords, an emerging city growing at a rate faster than any other area in Ireland over the past decade. The first priority for me has been the delivery date, the second being the cost to the tax payer. I am satisfied that the project, in its current form, can be delivered within the time frame alluded to the in the 2015 Capital Plan. Furthermore, I am satisfied that in the future, Transport Infrastructure Ireland will be in the position to enlarge capacity along the line, as required. The questions of linkages to other parts of the city do not fall within my jurisdiction and I believe they are adequately supported by other transport services, LUAS etc, although I am an avid supporter of DART Underground which appears to have put back in the table by Minister Ross. I would appreciate your address for my records.
Avada wrote: » If you really want to highlight it, talk to TDs in opposition and ask them to submit detailed parliamentary questions.
Grandeeod wrote: » Sorry, but thats another waste of time. The answers are often similar to what you get in writing. If I had the time I could cite tonnes of examples that came to absolutely nothing. If you want results you go for the jugular via the media and that's not being done anymore.
Avada wrote: » They are similar, but they're a matter of public record.