Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

N8/N25/N40 - Dunkettle Interchange [open to traffic]

1246787

Comments

  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Victor wrote: »
    How would they get to the roundabout? Are you suggesting the slip road that goes from the west (Cork) to the north (Dublin) be two-way? That would be a barrel of fun - not.

    How would traffic get from the M8 to Little Island?

    Give me a few mins to draft a map.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Iv come across a problem. What to do with the Glounthaune traffic. You probably couldnt send it to Dunkettle without having a bridge that runs parallel to the N8 between Sarsfield and Dunkettle. Here it is anyway (excluding glaunthaune Traffic)

    194196.jpg

    How much traffic uses that offslip to Glaunthaune?


  • Registered Users, Registered Users 2 Posts: 3,241 ✭✭✭hans aus dtschl


    Hogzy,
    There's a large industrial estate serviced by that slip road including all of Iarnród Eireann's freight depot. Also, a significant amount of the Glanmire and Glounthaune population use it. But realistically the freight depot is the biggest user of this. The image you drew even shows a little of it.


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    Hogzy,
    There's a large industrial estate serviced by that slip road including all of Iarnród Eireann's freight depot. Also, a significant amount of the Glanmire and Glounthaune population use it. But realistically the freight depot is the biggest user of this. The image you drew even shows a little of it.

    Yeah but there is another exit they could use further up the N25 (the second exit for Little Island). They can just use that exit. Its not as if thousands and thousand of cars need it anyway. IMO getting rid of the Glounthaune Slip is justified to ensure a free flow M8 to Cork City Center route.

    Glaunthaune traffic can be rerouted to the Little Island exit on the N25 (which can be widened if needs be). The N25 is already 3 lanes as far as that junction anyway so it could cope with the extra traffic.


  • Registered Users, Registered Users 2 Posts: 3,241 ✭✭✭hans aus dtschl


    I don't disagree that the slip could be gotten rid of if the Little Island junction was improved. However, the Little Island junction has not got a lot of extra room on either side and backs up considerably at peak times as it is, on the "old" road and within Little Island.

    In terms of comparison with the other roads concerned, it certainly is the least significant, but I think you really need to see the numbers before you can say the Little Island junction could survive the extra traffic. IMO it wouldn't.

    But look, my point over all others, the proposed dumbell interchange east of the dunkettle interchange is inadequate for intercity traffic.


  • Advertisement
  • Closed Accounts Posts: 1,735 ✭✭✭Irish and Proud


    Hi folks,

    There's now a brochure (PDF File - 1618KB) by Jacobs on the preferred option.

    Regards!


  • Registered Users, Registered Users 2 Posts: 797 ✭✭✭mydiscworld


    Hi folks,

    There's now a brochure (PDF File - 1618KB) by Jacobs on the preferred option.

    Regards!

    Great to see this progressing but doubt funding will be in place to pay for the CPOs.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Great to see this progressing but doubt funding will be in place to pay for the CPOs.
    Do you really think it would be that dear? We just need money for the land.
    I agree though, Varadkar's the Minister for Not Building Transport so he seems determined to do as little as possible.


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    I would prefer that version of the scheme NOT to progress.


  • Closed Accounts Posts: 4,725 ✭✭✭charlemont


    MYOB wrote: »
    I would prefer that version of the scheme NOT to progress.

    True because in several years they will have to work on it again !!


  • Advertisement
  • Closed Accounts Posts: 1,492 ✭✭✭KCAccidental


    If this option was to be built, I'm guessing they would signpost the route to the city centre on the M8 via the N25 South Ring and N28 South Link instead of the old way via Tivoli.

    It could be argued that they are future-proofing and I can see their point with the new North Ring Road to take traffic away from the interchange and the Port being moved to Ringaskiddy there would be little need for the majority of traffic to have to take the old N8 road. The problem with this is that while it would save money, it will cause problems in the short term and let's be honest the way the country is now we might not get the North Ring rd and new Port until a decade after this is built


  • Closed Accounts Posts: 560 ✭✭✭Jehuty42


    IE's freight depot, North Esk, has been disconnected from the line for a couple of years now, it's closed, so I wouldn't worry about traffic going there.


  • Registered Users, Registered Users 2 Posts: 6,660 ✭✭✭Blitzkrieger


    I think munchkin and others have made excellent points about the M8 - Cork City traffic clashing with traffic into Little Island. I mean, obviously there's been a lot of work put into the plans by experienced people, and we don't know what the current and predicted traffic volumes on those routes are, but from observation and from experience I can't believe that the (aptly named?) dumb bell junction will be anything but an impediment to traffic and probably downright dangerous.

    Does anyone know of an official petition against the current design? When is it supposed to be going for planning approval?

    I think the design has to be modified to make traffic into Little Island and from the M8 to Cork City free flow. What I think we need is bollards! Lots and lots of bollards. I've gotten the crayolas out again, but this modification is fairly counter-intuitive so bear with me....

    [edit] I've thought about it and think I can make it simpler - new drawings in new post. [/edit]


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    The problem with Dunkettle is the Little Island junction. So lets close it, move it and split it. That allows you to FULLY Grade Separate Dunkettle and improve capacity at Little Island. Glounthaune gets a hybrid style half junction. Put these midway between Cobh and the current Little Island junction. Avoids a lot of weaving.

    195403.jpg

    195402.jpg


  • Registered Users, Registered Users 2 Posts: 7,544 ✭✭✭Hogzy


    ^^^

    The little island junction you decided to move has absolutely no effect on Dunkettle.

    Its the Glaunthaune Junction thats the issue.


  • Closed Accounts Posts: 4,725 ✭✭✭charlemont


    Light blue...N8/ M8

    Dark blue... N25 Tunnel/ N8 City

    Green...N25/N25

    Yellow....M8/ N25 East Cork Parkway

    Black.....Little Island access roads. The black by the bottom centre of page could connect to Tivoli and the tunnel but to access M8 would require using road towards Tivoli and turning back at Dunkettle roundabout and following the slip road to M8. Basically to stop traffic crossing two three lanes.

    [IMG][/img]dunkettlenew.jpg Uploaded with ImageShack.us



    Forgot to draw a slip of the green line heading east which would branch off and connect to the new roundabout...


  • Registered Users, Registered Users 2 Posts: 6,660 ✭✭✭Blitzkrieger


    Yeah - would be nice, but I'm guessing it'd be fantastically expensive to build and cause massive disruption. With the purple and others you're also looking at a lot of elevation changes in a short space.

    @Chris - I don't think it'd be viable to lose the entrance/exit to Little Island there. It'd have a huge effect on traffic in Little Island. Glaunthaune would see less traffic, but there's plans to increas the traffic volume there too.


  • Registered Users, Registered Users 2 Posts: 6,660 ✭✭✭Blitzkrieger


    I was thinking about it this morning and I think I can make things simpler. My goal is to stick as close as possible to the preferred option, but I think the M8 traffic has to be made free flow. I think this can be done simply by introducing a contra flow on the bridge, changing the shape of some of the roads and moving the 'dumb bell' roundabouts a bit :

    195603.png

    Green arrows hopefully illustrate traffic flow. Yellow indicates physical barriers to seperate contra-flow traffic.

    Again, this solution does not take Little Island to Glounthaune traffic into account. I think this volume would be low, and could use alternative routes thoough the interchange to get there. If you wanted to take it into account, you could put another roundabout north of the junction :

    195604.png

    I'm still not happy with the amount of roundabouts Little Island traffic (especially from the city) have to go through. It probably wouldn't be in the budget, but maybe sometime in the future you could add a couple of new flyovers and make the whole thing free-flow.

    195605.png

    I'm also not happy with those two mini roundabouts in Glounthaune. I think you'd be better off either making the whole thing a traffic light controlled juntion, or make it one big irregularly shaped roundabout.

    I think you could also improve it by altering the plans. I know in earlier posts I suggested bringing city to Little Island traffic along that road to Glounthaune, but I think it might be better to build a new ramp (light blue) and merge it with traffic out of the tunnel. This would add extra traffic into the conflict between eastbound to N25, Little Island and southbound M8 traffic, but I think it could be done safely, and would cut down on the amount of bridges you'd have to build.

    195606.png


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Great idea. What you're proposing in effect is a U-turn lane. U-turn lanes are common in countries like Thailand and the United Arab Emirates. Here's an example.
    I independently had this idea, but in my version the U-turn flyover is not incorporated into the Little Island junction. It would be either between Dunkettle and LI or east of LI:

    Between Dunkettle and LI
    Advantage: Short journey
    Disadvantage: Space is tight, vehicle speed would have to be very low
    East of LI:
    Adv: Lots of room to build, so loops aren't so tight - vehicle speed is higher
    Disadv: Long winded journey

    I've mocked up a quick map.


  • Registered Users, Registered Users 2 Posts: 78,490 ✭✭✭✭Victor


    Does anyone know of an official petition against the current design?
    You don't need a petition. Just write to them explaining your concerns.
    I think the design has to be modified to make traffic into Little Island and from the M8 to Cork City free flow. What I think we need is bollards! Lots and lots of bollards. I've gotten the crayolas out again, but this modification is fairly counter-intuitive so bear with me....

    [edit] I've thought about it and think I can make it simpler - new drawings in new post. [/edit]

    The first design doesn't work as you give too short a distance for the bridge you add.

    The second design makes some trips much longer than they should be: http://maps.google.ie/maps?saddr=Lower+Glanmire+Rd%2FN8&daddr=51.9030422,-8.3519439+to:R623&hl=en&sll=51.903931,-8.380251&sspn=0.026849,0.084543&geocode=FT4GGAMddNB__w%3BFUL6FwMdOY-A_ylrGEUfV5tESDGw1gv8pscAEw%3BFXjvFwMdAwmA_w&mra=dvme&mrsp=1&sz=14&via=1&t=m&z=14
    The problem with Dunkettle is the Little Island junction. So lets close it, move it and split it. That allows you to FULLY Grade Separate Dunkettle and improve capacity at Little Island. Glounthaune gets a hybrid style half junction. Put these midway between Cobh and the current Little Island junction. Avoids a lot of weaving.
    Hogzy is right, I don't think there is any problem with the Little Island junction. If anything, the problem would be that it becomes over-subscribed, as it would be doing the work of two junctions.
    Interesting layout. There is a risk, that without the ability to get from Little Island / Glounthaune to the city and tunnel, longer trisp would be necessary and some inappropriate journeys would be made, e.g. HGVs using the back road between Glounthaune and Glanmire. http://maps.google.ie/maps?saddr=R623&daddr=51.9176165,-8.4000669+to:Lower+Glanmire+Rd%2FN8&hl=en&sll=51.913356,-8.384886&sspn=0.026843,0.084543&geocode=FfoDGAMdeyOA_w%3BFTAzGAMdPtN__yk_MV-6HptESDGh2wn9pscAEw%3BFXYFGAMd-M5__w&mra=dme&mrsp=0&sz=14&via=1&t=m&z=14 and http://maps.google.ie/maps?saddr=R623&daddr=51.9176165,-8.4000669+to:Lower+Glanmire+Rd%2FN8&hl=en&ll=51.916665,-8.390636&spn=0.006115,0.042272&sll=51.913356,-8.384886&sspn=0.026843,0.084543&geocode=FfoDGAMdeyOA_w%3BFTAzGAMdPtN__yk_MV-6HptESDGh2wn9pscAEw%3BFXYFGAMd-M5__w&mra=dme&mrsp=0&sz=14&via=1&t=m&z=15&layer=c&cbll=51.916672,-8.390647&panoid=TMlr5Sux7trkOQIXGl27cA&cbp=11,202.16,,0,4.93

    Your black line is rather impractical. The northern end would be immensely steep, there is no space for it and it would require a substantial tunnel - about 100 under the N25, similar to the railway one. http://binged.it/ArqCZq It would require a substantial section of the N25 to be reconstructed. If anything, one would make that an elevated section.

    The pink bit should be able to use the existing bridges over the interchange roundabout, although minor reworking may be required to fit the blue bit under the east bridge.

    Removing the original roundabout, while 'nice', may be inappropriate. Roundabouts are useful psychological markers to encourage motorists to change from motorway to urban driving.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 78,490 ✭✭✭✭Victor


    I was thinking about it this morning and I think I can make things simpler. My goal is to stick as close as possible to the preferred option, but I think the M8 traffic has to be made free flow. I think this can be done simply by introducing a contra flow on the bridge, changing the shape of some of the roads and moving the 'dumb bell' roundabouts a bit :

    https://us.v-cdn.net/6034073/uploads/attachments/555/195603.png

    https://us.v-cdn.net/6034073/uploads/attachments/555/195604.png

    https://us.v-cdn.net/6034073/uploads/attachments/555/195605.png

    https://us.v-cdn.net/6034073/uploads/attachments/555/195606.png
    The problem with each of these is that they are too tight in horizontal and vertical curvature.
    spacetweek wrote: »
    Great idea. What you're proposing in effect is a U-turn lane. U-turn lanes are common in countries like Thailand and the United Arab Emirates. Here's an example.
    Perhaps not the easiest to use with a truck.
    I independently had this idea, but in my version the U-turn flyover is not incorporated into the Little Island junction. It would be either between Dunkettle and LI or east of LI:

    Between Dunkettle and LI
    Advantage: Short journey
    Disadvantage: Space is tight, vehicle speed would have to be very low
    East of LI:
    Adv: Lots of room to build, so loops aren't so tight - vehicle speed is higher
    Disadv: Long winded journey

    I've mocked up a quick map.
    To be practical, this would need to take a much wider curve. Note the 30km/h speed limit on the N3-M50 junction that is causing problems.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Victor wrote: »
    To be practical, this would need to take a much wider curve. Note the 30km/h speed limit on the N3-M50 junction that is causing problems.
    Where is that exactly?


  • Registered Users, Registered Users 2 Posts: 78,490 ✭✭✭✭Victor


    spacetweek wrote: »
    Where is that exactly?
    I think ton the West to south slip road.


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Victor wrote: »
    spacetweek wrote: »
    Where is that exactly?
    I think ton the West to south slip road.
    OK,but at rush hour 30km/h is actually not bad.


  • Registered Users, Registered Users 2 Posts: 6,660 ✭✭✭Blitzkrieger


    Victor wrote: »
    The problem with each of these is that they are too tight in horizontal and vertical curvature.

    The way I've drawn them, probably. In some ways I might have stuck too close to the original design. You could probably adjust the curvature on the approaches to the bridge on the east on both sides of the N25 with (hopefully) minimal impact to the design. Space is always going to be a concern, but I think you could get them to a point where you could have a 80kph limit. If you look at some of the mad cow interchange, 60kph could be a realistic goal too. I was trying to avoid it, but I think moving the bridge a little further east and changing the shape of it could help too, but might force a bit of re-jigging with the minor roads around there too. If I get a chance I might get the crayolas out again later and see if I can illustrate it better.


  • Registered Users, Registered Users 2 Posts: 78,490 ✭✭✭✭Victor


    spacetweek wrote: »
    OK,but at rush hour 30km/h is actually not bad.
    Not when there is a car doing 100-120km/h behind a truck that is obeying the 30km/h.


  • Registered Users, Registered Users 2 Posts: 6,660 ✭✭✭Blitzkrieger


    Victor wrote: »
    You don't need a petition. Just write to them explaining your concerns.

    An Bord Planala or the construction company?

    The two main problems I see with the design I've illustrated belown. The first is that with so much traffic from the north side of the interchange using the dumb-bell roundabouts, I'd worry that the traffic would back up all the way to point A. This would mean traffic blocking slip roads and causing hazards. But even if traffic didn't back up that far, where you get queues, you get queue skippers. Muppets driving down the outside as if they're going to the N25 then cutting in at the last minute would be a danger too.

    I'd also worry that muppets would think the yellow route would be the path from the city to Little Island/Glounthaune. I'm guessing there'll be pletty of road markings to discourage it.

    197500.png

    So I've had another go at drawing out a solution. Again, yellow indicates barriers between contra flow traffic and hopefully green arrows illustrate traffic flow. Some of the curves are not what I'd like them to be, but maybe somebody who knows what they're doing would be able to do better.

    In this version I've moved the Glounthaune slip road to the other side of the "U-turn lane". This means we'd have to build another bridge but gives more room for the U-turn lane. The curve at the end of the U-turn lane to take traffic into Little Island is also a bit sharp - it probably could be moved or re-drawn to be smoother.

    I've also given no provision for traffic from the N25 or Little Island to Glounthaune. At the moment this traffic uses the tunnel roundabout, going all the way around to get to Glounthaune. In my version something similar happens - traffic goes all the way around the interchange to get to Glounthaune. Alternative solutions for including these traffic flows can be seen in my earlier posts.

    197501.png


    I would also propose building a new slip road to point B, rather than opening up the old road all the way to Glounthaune and bringing city-Little Island traffic that way. I think this would be cheaper and simpler than building all those bridges, and I think the extra traffic could safely merge between B and A.


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    Anyone considering emailing Jacobs with your own designs ?


  • Registered Users, Registered Users 2 Posts: 247 ✭✭bg07


    An advertisement was in yesterday's Irish Examiner notifying of the application for a motorway improvement order and EIS for the scheme

    details at www.n8n25dunkettle.ie


  • Advertisement
  • Closed Accounts Posts: 64 ✭✭FullBeard


    Some excellent CGI of the proposed changes after completion superimposed onto existing aerial photographs here: http://n8n25dunkettle.jacobs.com/docs/32102066%20Dunkettle%20EIS%20VOL%203%20Figures%20-%20Fig%201.1.1%20to%20Fig%202.4.1.PDF


  • Registered Users, Registered Users 2 Posts: 997 ✭✭✭Colm R


    FullBeard wrote: »
    Some excellent CGI of the proposed changes after completion superimposed onto existing aerial photographs here: http://n8n25dunkettle.jacobs.com/docs/32102066%20Dunkettle%20EIS%20VOL%203%20Figures%20-%20Fig%201.1.1%20to%20Fig%202.4.1.PDF


    Nice images indeed. I like the way they used photos of the current set up which includes heavy tailbacks in all directions, and the superimposed images have no tailbacks at all. ;)


  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    Not a cheap job that, something like €30-40m I'd reckon....with no land acquisition costs included.

    Looks significantly more 'advanced' than the ultratight M50 junctions such as the one on the N3/M50 where you are down to around 30kph on some of the curves.

    Mind you every loony green ecomentalist in Cork will be up in arms about the reconfiguration of the estuarine area surrounding the junction. Be a nice soggy wet spot for a camp I reckon.


  • Registered Users Posts: 761 ✭✭✭Jayuu


    Looks fairly detailed and thought out. Can't imagine it will be an easy job to get this done. This disruption may be considerable. About the only part of it I don't like is the M8 > N8 Cork movement which is a bit clumsy involving an eastbound turn and then through two roundabouts to come back west into Cork. Now I don't know how many people would be doing this but it just seems a little awkward.


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    Any word on when construction should start ?


  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    Any word on when construction should start ?
    My guess is that this will be paid for out of the regular budget and will be a top priority. Within two years maybe. Newlands is the only other pinch point on the Dublin-south/southwest road and that's getting sorted shortly.


  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,144 Mod ✭✭✭✭spacetweek


    We will get 400 m of new motorway with this! The short section north of the junction was omitted during the redesignations of 2009 (source).


  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    The Oral Hearing is now ongoing
    Interchange upgrade ‘vital for growth of Cork’
    By Sean O’Riordan
    Friday, November 16, 2012

    An upgrade of the Dunkettle/Jack Lynch Tunnel interchange is "vital for the growth of Cork", a Bord Pleanála oral hearing was told yesterday.
    In the event of the proposed €90m upgrade being approved, it would signal the commencement of other major projects in the region.

    To date, traffic congestion has been a setback to new projects.

    Cork County Council’s senior planner, Andrew Hind, said the improvement plan was vital for Cork.

    He referred to the Port of Cork’s plans to build a deep-water terminal in Ringaskiddy which were previously rejected by An Bord Pleanála amid concerns the extra heavy goods traffic generated would prove too much for the already over-capacity junction.

    Mr Hind said he wanted to see a multimillion-euro housing project, proposed by O’Flynn Construction at Dunkettle, proceed. It was rejected by An Bord Pleanála for the same congestion reason. <snip>

    Around 30 known archaeological sites are dotted around the designated project area, most of which are post-medieval.

    NRA experts said they would carry out "test-trenching and metal detector surveys" to establish if there were other sites of interest.

    Dr Jervis Good of the National Parks & Wildlife Service made recommendations to An Bord Pleanála inspector Jane Dennehy, which he said would ensure that otters and little egret roosts on the Glashaboy Estuary are protected during construction and thereafter.
    http://www.irishexaminer.com/ireland/interchange-upgrade-vital-for-growth-of-cork-214124.html

    From the sounds of it the NRA are able to accommodate any requests from interested parties in ensuring businesses and residents are being looked after.
    Well, the residents were chancing their arm looking for double glazing for their houses but they dont seem to be getting that, but rather a silent smooth surface on the road that reduces noise.

    BTW: theres a road round the corner from me with it recently installed and the quiet surface is indeed something to behold. Theres a much lighter zipping noise compared to the louder deeper rumble of the regular surfacing.


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    Surely the housing development at Dunkettle isn't going ahead anymore ?

    Be interested to see if anything will now be done with the Dunkettle Roundabout due to improved traffic flow from Dunkettle Interchange. All it would require is a slip road to cater for traffic, coming from the East and heading into the city centre.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    Medium to long term plans for that is to replace the Dunkettle Roundabout with traffic lights.

    [For those that dont know the Dunkettle Roundabout (where the Tivoli DC interacts with the north road to Glanmire) is different from the Dunkettle Interchange which is where the M8/N25/N40 go together]


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    Medium to long term plans for that is to replace the Dunkettle Roundabout with traffic lights.

    [For those that dont know the Dunkettle Roundabout (where the Tivoli DC interacts with the north road to Glanmire) is different from the Dunkettle Interchange which is where the M8/N25/N40 go together]

    Has the world gone mad ? Are they actually trying to create traffic chaos ?


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    The Dunkettle Roundabout as it is is really stupid. You have tonnes of traffic coming out of Cork which has to give way at the roundabout to far, far fewer cars coming from the N25 east going to Glanmire. Its just silly.


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    The Dunkettle Roundabout as it is is really stupid. You have tonnes of traffic coming out of Cork which has to give way at the roundabout to far, far fewer cars coming from the N25 east going to Glanmire. Its just silly.

    Well then, signalise the roundabout. Would still have a higher capacity than a signalised junction.


  • Registered Users, Registered Users 2 Posts: 797 ✭✭✭mydiscworld


    So the Oral Hearing was last week.

    How long more, typically, would it take ABP to announce their decision?


  • Registered Users Posts: 66 ✭✭imangry29


    Minutes of meeting from Cork CoCo Feb 2013 - NRA have allocated €200,000 to Dunkettle scheme to progress detailed design, subject to outcome of statutory proceedings (ABP). (other new major primary scheme in Cork awarded funding was N22 Ballyvourney-Macroom I.e. €400,000 for land acquisition subject to outcome of court proceedings). Dunkettle could overtake Macroom this year in planning process if N22 goes to Supreme Court.


  • Registered Users, Registered Users 2 Posts: 2,794 ✭✭✭Bards


    Good News - This has been approved by ABP

    http://www.irishexaminer.com/ireland/100m-dunkettle-interchange-project-given-green-light-231374.html

    An Bord Pleanála has given the green light to National Roads Authority (NRA) plans for a €100m upgrade of the Jack Lynch Tunnel/Dunkettle interchange.


    The board voted by a three-to-one majority to approve the scheme, at one of the country’s busiest junctions.

    It also approved the issuing of Compulsory Purchase Orders (CPOs) which are required as the NRA needs to acquire land to construct some elevated new slip roads.

    More than 90,000 daily vehicle movements have been recorded at the junction.

    An Bord Pleanála agreed with an NRA submission that an upgrade was needed to alleviate the level of congestion currently being experienced at the junction during peak times.

    Despite some objections, the board felt the proposed development would not be likely to have any significant adverse effects on the environment.

    The board, however, imposed a number of conditions.

    They include a proviso the NRA carry out a number of mitigation measures to ensure no adverse impact on flora and fauna in the area.

    Automatic traffic counters will also have to be installed in the area and the NRA will be required to carry out a review of traffic flow at the planned upgraded junction every two years.

    Plans for a proposed cycle path on a section of the upgraded junction have been refused because the board considered it could contribute to accidents.

    An oral hearing took place at the Silver Springs Moran Hotel over two days last December.

    At the hearing, the NRA’s team of experts argued congestion was costing the State and the upgrade would save commuters a significant amount of time.

    The plan involves creating a number of dedicated local access roads around the junction, thus separating those making local journeys from regional and national journeys.

    The signalised roundabout at the northern end of the tunnel will be removed for total free flow and a dedicated slip road will be built on the city side of the tunnel so traffic can directly access the northbound lanes of the M8.

    NRA spokesman Sean O’Neill said he welcomed the Bord Pleanála decision.

    “We would like to move forward on the scheme but it is subject to funding being made available. It will cost in the region of €100m,” he said.

    The decision is also likely to be welcomed by the Port of Cork which was refused planning permission by An Bord Pleanála for a major new cargo-handling terminal in Ringaskiddy. The main reason for the refusal was the increased HGV traffic this would generate would have further impacted on tunnel congestion.

    The port authority, meanwhile, is about to resubmit planning for a scaled-down terminal in Ringaskiddy.


  • Registered Users, Registered Users 2 Posts: 4,561 ✭✭✭AugustusMinimus


    Absolutely fantastic news.

    Will eventually be dual carriageway all the way from Macroom to Belfast.


  • Registered Users, Registered Users 2 Posts: 5,963 ✭✭✭Chris_5339762


    Great news. I can see this progressing quickly, due to it being Corks version of Newlands Cross. Once the Sarsfield/Bandon flyovers are done, the impetus will move to this.


  • Registered Users, Registered Users 2 Posts: 7,907 ✭✭✭munchkin_utd


    Absolutely fantastic news.

    Will eventually be dual carriageway all the way from Macroom to Belfast.
    you got me thinking of just how much has already been achieved....

    At the moment from the end of the Ballincollig By-Pass to north of Ballymena half ways to Coleraine theres a continuous stretch of 492km of motorway and Dual Carraigeway with only Dunkettle and Newlands cross being potential sources of delays!
    http://goo.gl/maps/AOcs3


  • Registered Users, Registered Users 2 Posts: 7,516 ✭✭✭Outkast_IRE


    Shame that the provision for cyclists is gone, it would be great to have a cycle lane from the city to midelton. Im sure there a good few in little island and carrigtwohill working there that would enjoy the challenge of a cycle.


  • Registered Users, Registered Users 2 Posts: 69,537 ✭✭✭✭L1011


    you got me thinking of just how much has already been achieved....

    At the moment from the end of the Ballincollig By-Pass to north of Ballymena half ways to Coleraine theres a continuous stretch of 492km of motorway and Dual Carraigeway with only Dunkettle and Newlands cross being potential sources of delays!
    http://goo.gl/maps/AOcs3

    And at least 4 roundabouts in the north