07.04.2021 18:12 #26
Registered User
Originally posted by bazermc
Originally posted by Irish Water: Rebecca
Hi Bazermc,

These works have been completed as of now.

Could you PM us the exact location of the needed reinstatement and we will pass this along to our contractors.

Reinstatement works usually take place 4-6 weeks after works are completed but I will make the contractors aware of the works needed.

Thanks,
Rebecca


Many thanks

The South Circular road starting at the cross road at Dolphins Barn going west through to Rialto Village.

The road is particularly bad at this exact location however I am aware residents have issues with further up the road at the LUAS bridge before kilmainham - https://goo.gl/maps/cdHazDaHkzy6JzjBA

Having just bounced home along the SCR, I can confirm this post.

Both locations - beside the funeral directors at the Dolphin's Barn end, and from the Rialto roundabout to the Luas bridge - are both in bits.
1 thank