01.03.2021 22:59 #20
Registered User
Originally posted by Irish Water: Jose
Hi there,

Thanks for getting in touch and apologies for any inconvenience caused.

These works were part of the National Leakage Reduction Programme. Please see https://wtr.ie/3jIjYOg

We are not aware of any future disruptions for this area.

Thanks,
Jose


Hi Jose

This same section of road was dug up again weekend just gone.

Why is this area being dug up so often and not finalised.

I have a photo I took of exact same works being done in July 2020. That’s nearly 9 months ago.

The road is an awful state, filthy dirty, half patched up and loose gravel everywhere. There’s also piles of those lane dividers left behind so presume they’ll be back to pick them up or there’s another round of digging in the works.

Please advise when this works will be done and the road put back into proper condition.

Thanks.
Last edited by bazermc: 01.03.2021 at 23:35.
1 thank