Advertisement
Help Keep Boards Alive. Support us by going ad free today. See here: https://subscriptions.boards.ie/.
If we do not hit our goal we will be forced to close the site.

Current status: https://keepboardsalive.com/

Annual subs are best for most impact. If you are still undecided on going Ad Free - you can also donate using the Paypal Donate option. All contribution helps. Thank you.
https://www.boards.ie/group/1878-subscribers-forum

Private Group for paid up members of Boards.ie. Join the club.
Hi all, please see this major site announcement: https://www.boards.ie/discussion/2058427594/boards-ie-2026

Cost of shed

124

Comments

  • Registered Users, Registered Users 2 Posts: 5 twistermista


    80-100k I would say for a 5 bay



  • Registered Users, Registered Users 2 Posts: 166 ✭✭Austinbrick


    Any one know anything about this company? Anyone get a shed delivered by them? What do you think of the prices? Looking to build a. Shed for hay and machinery this year or next. Working off of a 1960s70s

    4 bay 2 lean two shed at the minute. Time to do something for this generation and the next!!



  • Registered Users, Registered Users 2 Posts: 285 ✭✭Omallep2


    What you mean by 2 year depreciation on the tank?



  • Registered Users, Registered Users 2, Paid Member Posts: 21,164 ✭✭✭✭Bass Reeves


    AFAIK you can deprecate a tank over two years if it suits

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 1,412 ✭✭✭DJ98


    Just a question on shed walls in a sheep shed. Planning on shuttering the end wall as this will take the most pressure when cleaning out but would building the side walls up with 6" Solid blocks work out much cheaper that shuttering? Only 2 spans to be done.



  • Advertisement
  • Registered Users, Registered Users 2, Paid Member Posts: 1,589 ✭✭✭Tileman


    ud be aswell go all with shuttering especially if u are going to have pans there to the end section. Better job for life. Very little in diffeeence and probably cheaper nowadays with price of labour



  • Registered Users, Registered Users 2, Paid Member Posts: 21,164 ✭✭✭✭Bass Reeves


    If you have a lad shuttering part of it he might as well do it all he is not going to charge too much extra. There is a few small operators that specialise in that type of work

    Slava Ukrainii



  • Registered Users, Registered Users 2, Paid Member Posts: 2,780 ✭✭✭DBK1


    If they’re standard 15’9 bays then each bay will need approx 2.3 cubic metres of readymix at 8” thick and 8 foot high. To build a block wall that height you’ll need approx 120 6” blocks if standing or 260 blocks if on the flat. By rights the block wall would need to be plastered then.

    It’s easy to price materials for both ways and don’t forget to allow for sand and cement for the block wall. After that just ask the men you’re thinking of doing the job for a price both ways and you’ll know yourself then.

    If you’re able to lay the blocks yourself and have the time to do it then it will probably be a bit cheaper that way, if you’re paying for labour the mass concrete will be cheaper along with being a far superior job and will be done and dusted in 2 days.



  • Registered Users, Registered Users 2 Posts: 145 ✭✭Farm365


    Interested in this thread as need to do something similar myself. In the figures provided by DBK1 the concrete would cost €230 per bay based on €100 per cubic meter + labour?



  • Registered Users, Registered Users 2 Posts: 762 ✭✭✭PoorFarmer


    No steel allowed for in that calculation. Would be nice to have some bit in a 2.4 high wall especially if cleaning out with a loader etc.. Most likely would need a truck with a conveyer or else a digger/loader for the pour so would be looking at a bit more than €100/m3. I couldn't get it for that price here anyway these days



  • Advertisement
  • Registered Users, Registered Users 2, Paid Member Posts: 21,164 ✭✭✭✭Bass Reeves


    Any ready mix is about 25+N is 130-150/ cubic M delivered and below 6 cubic meters you pay a levy on any cubic meter not on the load.

    Usually minimum is 9"" wide if using smaller shuttering pans. Steel will be approx 100/sheet for 8'X16' grids @12mm bar.

    I think if you can get the truck right up to it you will not need a conveyor.

    Slava Ukrainii



  • Registered Users, Registered Users 2 Posts: 5,553 ✭✭✭Grueller


    Cost of concrete varies wildly based on location bass. €110 plus VAT here for 35N.



  • Registered Users, Registered Users 2, Paid Member Posts: 5,065 ✭✭✭White Clover


    The wall will be the same width as the shed stanchions. Lots of farm sheds use 8 x 4 or 8 x 5 H iron with larger portal frames using 10 x 5 or even bigger.



  • Registered Users, Registered Users 2 Posts: 762 ✭✭✭PoorFarmer


    Never liked filling full height shutter straight from the chutes, especially if the truck is parked at the same height as the bottom of the shutter.

    I'm a similar price per metre delivered and having trouble sourcing it even at that. Was quoted €165/m3 lately for 6m 30N. I am about 35km from 3 different batching plants but they are all getting enough work locally to leave me sitting. Lucky enough my old job was with a shuttering contractor and he orders for me whenever I need it.

    8 inch wall is plenty when tying into the stanchions and easier to shutter too



  • Registered Users, Registered Users 2 Posts: 2,211 ✭✭✭mr.stonewall


    109 Inc levy ex vat for 30N approx 3 weeks ago. Full load and 20k from plant

    What way would precast wall slab be instead of shuttering it



  • Registered Users, Registered Users 2 Posts: 944 ✭✭✭lmk123


    I think they’re €40/m2 for 100mm and €60/m2 for 150mm



  • Registered Users, Registered Users 2, Paid Member Posts: 4,492 ✭✭✭kk.man


    To those in the know; What would one span of a slatted shed cost?... no electricity, no water, non grant spec. It would include a aeration point, basic feed barrier, adequate feed passage/face. None TAMS spec.

    Ok before you jump to conclusions one span is not practical.... just trying to estimate a quote for a twi span tbh.



  • Registered Users, Registered Users 2 Posts: 355 ✭✭grass10


    Pouring an 8 foot wall can never be dome off chutes unless at least 4 foot of the wall is underground you either pay for a conveyor or pay for a digger/ loader to fill lads have to be realistic about these things



  • Registered Users, Registered Users 2 Posts: 4,132 ✭✭✭Dickie10


    i want to build a 3 bay straw bedded shed in an area where my current Dung Stead is. this area is wasted space at minute as i only now haveabout 10 foot in width by 30 foot in legth used to store dung that is now 3 winters of beddding matieerial. so even if i was putting out dung every 2nd year I wouldnt neeed a huge area to store it. I have an area left aside in the dung stead at bottom for at least 2 years worth if not more. so i have a good concrete floor and walls of about 7 foot also mass concrete with steel. Should I include a picture of this dung stead on here? any advice would be great



  • Registered Users, Registered Users 2 Posts: 944 ✭✭✭lmk123


    Do any of ye know how much roughly it is to get someone to do the TAMS application for a slatted shed



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 268 ✭✭Farmer Dan


    Hi. How close could you dig / pour a Slatted tank at the rear of a existing solid floor shed. Eaves is 4.0m.

    Existing is in black. Proposed is in red.

    Thanks




  • Registered Users, Registered Users 2 Posts: 4,407 ✭✭✭Hard Knocks


    You’ll lose a good area, enough for shutters and a person to work at the back of them. Best speak to your contractor



  • Registered Users, Registered Users 2 Posts: 1,645 ✭✭✭Wildsurfer


    We got a tank within 8 feet of an existing mass concrete wall with a good foundation last year. It would depend on the type of ground you're digging and how secure that back wall is.



  • Registered Users, Registered Users 2 Posts: 268 ✭✭Farmer Dan


    Thanks lads for reply. I was planning on removing the existing mass concrete back wall and putting feed barriers up in its place.

    There's currently a good foundation under this existing wall / pillars.

    I was hoping to have the tank a meter or so from the current back girders etc.

    Ground would be sandstoney.



  • Registered Users, Registered Users 2, Paid Member Posts: 31,315 ✭✭✭✭whelan2




  • Registered Users, Registered Users 2 Posts: 5,553 ✭✭✭Grueller


    At no extra cost? Our local office wanted €1300 to do one.



  • Registered Users, Registered Users 2, Paid Member Posts: 31,315 ✭✭✭✭whelan2


    I might have paid 300 euro but it was over 2 years ago. Tbh he earned his money as we extended the deadline a few times and there was a few complications with the partnership etc



  • Registered Users, Registered Users 2 Posts: 944 ✭✭✭lmk123


    €1300 to do a grant application ? That can’t be right, it just can’t be



  • Registered Users, Registered Users 2 Posts: 944 ✭✭✭lmk123


    Yeah I was thinking / hoping it wouldn’t be much more than that, I’m waiting for the bill just wanted an idea of what it might be, thanks



  • Advertisement
  • Registered Users, Registered Users 2, Paid Member Posts: 31,315 ✭✭✭✭whelan2


    My advisor told me the cost beforehand. I know some tams applications are straightforward but ours wasnt