Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

[Buying] new built greenway - kiltipper D24

2

Comments

  • Registered Users Posts: 29 Liffeyrumours


    Just for anyone might find it helpful, this is how I have measured the garden size:

    You could open the site plan PDF with the Adobe Acrobat reader , then in tools / select measure / select snap type to measure (distance or area)

    click on anywhere in the pdf to start measuring then (mouse right click) and select Change scale Ratio and precision



    enter Scale Ratio : 1 mm = 250 mm

    or 1 mm = 50 depend on which file you use (site plan or house type floor plan pdf).

    scale of the site plan PDF is 1:250
    scale of the floor plan pdfs is 1:50

    you can then literally measure distance or area of anything on the map, including gardens, house space, walls, streets,driveway, etc.

    This way is depend on accuracy of site plan/floor plan provided which I believe it should be at least near real figures.



    Also:

    you can measure how far your house will be from the side of the development and from Kiltipper road then estimate your house location in compare to the nearest flood light using google earth or ESRI map



    https://earth.google.com/web/search/Kiltipper,+County+Dublin/@53.26922799,-6.36438472,111.60022339a,532.08189055d,35y,0h,0t,0r/data=CigiJgokCfja4pGNpEpAEaNdw4YipEpAGbL2WI2izBjAIRfLBfNS1xjA




    more info about pdf measurement: https://helpx.adobe.com/in/acrobat/using/grids-guides-measurements-pdfs.html


    This is amazing! Thanks so much. Will give it a go.


  • Registered Users Posts: 1 GarrethOR


    Hi All,

    Just a quick update, Drove by Saturday evening. Seems like they are flying along with the builds. I can't attach image I took as I am a new user.
    Has anyone found out the size of the gardens?

    Thanks


  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    GarrethOR wrote: »
    Hi All,

    Just a quick update, Drove by Saturday evening. Seems like they are flying along with the builds. I can't attach image I took as I am a new user.
    Has anyone found out the size of the gardens?

    Thanks


    Thanks GarrethOR for the update, please see my post above about how to calculate garden size.



    From the logo on the houses they are using prefabricated timber frame from IJM https://ijmtimberframe.com/ which is a way faster than traditional building techniques so hopefully they should be able to deliver on schedule.


  • Registered Users Posts: 29 Liffeyrumours


    Just for anyone might find it helpful, this is how I have measured the garden size:

    You could open the site plan PDF with the Adobe Acrobat reader , then in tools / select measure / select snap type to measure (distance or area)

    click on anywhere in the pdf to start measuring then (mouse right click) and select Change scale Ratio and precision



    enter Scale Ratio : 1 mm = 250 mm

    or 1 mm = 50 depend on which file you use (site plan or house type floor plan pdf).

    scale of the site plan PDF is 1:250
    scale of the floor plan pdfs is 1:50

    you can then literally measure distance or area of anything on the map, including gardens, house space, walls, streets,driveway, etc.

    This way is depend on accuracy of site plan/floor plan provided which I believe it should be at least near real figures.



    Also:

    you can measure how far your house will be from the side of the development and from Kiltipper road then estimate your house location in compare to the nearest flood light using google earth or ESRI map



    https://earth.google.com/web/search/Kiltipper,+County+Dublin/@53.26922799,-6.36438472,111.60022339a,532.08189055d,35y,0h,0t,0r/data=CigiJgokCfja4pGNpEpAEaNdw4YipEpAGbL2WI2izBjAIRfLBfNS1xjA




    more info about pdf measurement: https://helpx.adobe.com/in/acrobat/using/grids-guides-measurements-pdfs.html

    @blackswanie - this worked so well. Measurements equated to almost exactly the area quoted on the floor plans. Really useful exercise. We were pleasantly surprised by some measurements whereas other spaces were a little smaller than we had anticipated. But overall happy with everything. Thanks again. :)


  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    @blackswanie - this worked so well. Measurements equated to almost exactly the area quoted on the floor plans. Really useful exercise. We were pleasantly surprised by some measurements whereas other spaces were a little smaller than we had anticipated. But overall happy with everything. Thanks again. :)


    You are welcome, I have created a group on FB, it might be easier to discuss and share photos there (search for greenwaykiltipper).


  • Registered Users Posts: 29 Liffeyrumours


    You are welcome, I have created a group on FB, it might be easier to discuss and share photos there (search for greenwaykiltipper).


    Great idea. Can't find it in search. Could you post or PM the link please?


  • Registered Users, Registered Users 2 Posts: 30 blackswanie




  • Registered Users Posts: 12 Hunterwise54


    Does anyone know what going on over the far side of the road? Think its directly across from the astro. Construction gates up, diggers and lots of muck 🀔 couldnt see any planning lodged on the sdcc website


  • Registered Users Posts: 29 Liffeyrumours


    Does anyone know what going on over the far side of the road? Think its directly across from the astro. Construction gates up, diggers and lots of muck 🀔 couldnt see any planning lodged on the sdcc website

    Not sure about this one. I've a friend who's very involved in Thomas Davis so I'll try and get some info.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,060 ✭✭✭SimonMaher


    Does anyone know what going on over the far side of the road? Think its directly across from the astro. Construction gates up, diggers and lots of muck �� couldnt see any planning lodged on the sdcc website

    It's a new full sized pitch for Thomas Davis. They had a pitch where Greenway is being built now which is popping across the road! The new estate is in a nice spot (we're up the road in Marlfield) and the walk through Kiltipper Park and up to the reservoir is really nice. Good to be able to go from built up to nature so quickly.

    For info, our kids are in St Maelruans primary in Old Bawn and are happy there. Both are in Thomas Davis (it's a great setup) and little fella (6) is in the Tallaght Rugby Club academy which is just down the road on the Firhouse Road.

    Simon


  • Registered Users Posts: 8 HOPE100


    Hi, we are looking into purchasing the 4 bed detached and can’t seem to get information on the floor plans etc. would anyone have a drawings on these or know where to locate them ? Many thanks


  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    HOPE100 wrote: »
    Hi, we are looking into purchasing the 4 bed detached and can’t seem to get information on the floor plans etc. would anyone have a drawings on these or know where to locate them ? Many thanks




    Hello,

    Please contact Paul from GVM he should be able to provide you with all details and add you to mail list of next phase, also floor plans is available in the planning permission:



    http://www.sdublincoco.ie/Planning/Details?regref=SD17A%2F0368&fbclid=IwAR18_MdlZ2aMdXDOBrSw15Hv5A4cz6HA6ZJvy3pitTGJEwhnHG03ynmlpIY


    Thanks


  • Registered Users Posts: 12 daithi_240


    Hi everyone hope everybody is keeping well. I spoke to Paul on Monday and he noted all phase 1 contracts have now been signed and returned. He didn't have any update on phase 2 or the brochure however. Has anyone else been in contact with him or heard any different? I believe the builder was putting a bit of pressure on them to get contracts back etc. Building progress looks like it's progressing well!


  • Registered Users, Registered Users 2 Posts: 1,060 ✭✭✭SimonMaher


    daithi_240 wrote: »
    Hi everyone hope everybody is keeping well. I spoke to Paul on Monday and he noted all phase 1 contracts have now been signed and returned. He didn't have any update on phase 2 or the brochure however. Has anyone else been in contact with him or heard any different? I believe the builder was putting a bit of pressure on them to get contracts back etc. Building progress looks like it's progressing well!

    No updates here either other than that the building is progressing well, aided by the nice weather! First dozen or so houses are now up and bases being completed for the next terrace. Wonders of timber frame construction!

    Simon


  • Posts: 0 [Deleted User]


    Off topic, but the little cafe at the end of the lane that forms part of Kiltipper Woods Care Centre is open to the public and does an impressive breakfast for a fiver and lovely coffee. Plus amazing lunches and desserts. The strawberry gateau is to die for. ;)

    Its a good thing I don't live as close as you will be.


  • Advertisement
  • Registered Users Posts: 12 Hunterwise54


    Hi All, Its been awhile since I posted. Just wondering if anyone has heard anymore on when phase 2 is launching and if the expected completion date for phase 1 is still Jan 2022?

    I believe there is a couple of issues with phase 1 measurements and the bathroom/kitchen crowd not playing ball. Hoping for a bit of reassurance that things are going to plan still. Planning on buying from the drawings that were made available so hope nothing too much is changing.

    Hope everyone is enjoying the great weather!! This time next year hopefully in our new back gardens 😁



  • Registered Users Posts: 2 Worth87


    haven't heard anything on phase 2 or completion date of phase 1 but was under the impression it was March 2022?? The measurements have us worried too because they aren't giving out exact measurements any more and from being up there the gardens on the 3 beds look a lot smaller than we were advised at first. Really hope we aren't doing to be ripped off now, paying enough as it is!! The kitchen place aren't replying to anyone and the bathroom place aren't doing it anymore apparently?!



  • Registered Users Posts: 12 Hunterwise54


    I passed by myself the other day but still hard to make out the sizes. Whats the m2 they orginally gave for the back garden? I would have assumed going by other newbuilds they would have been around 90m2. Is anyone pushing on the brochure from Paul? I agree they are not cheap so they need to be upfront of what the exact measurements are. Im sure they know this when building has already commenced. The builders know what measurements they are working to.

    Hard to believe both the kitchen/bathroom place are being awkward when its a big enough contract for both.

    Maybe with enough pressure on Paul he will get the details clarified.

    Post edited by Hunterwise54 on


  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    Most of back garden size is 77 m2 or above, you can get any measurement using the plans provided and acrobat reader



  • Registered Users Posts: 12 Hunterwise54


    Thanks I'll try that. Does 77m2 not seem very small? Considering the 3 beds are about 118m2 the back garden size is nearly at the smallest it could be.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    yeah however not the minimum, I have seen back garden inside Dublin around 66 M2



  • Registered Users Posts: 834 ✭✭✭amor3


    Has anyone heard anything at all?


    I'm registered for phase 2 but information is very slow coming!



  • Registered Users Posts: 12 Hunterwise54


    Hi Amor3

    Have not heard anything on phase 2. Have you got any information? Presume it will be this year. They seem to be flying with the building at the moment.



  • Registered Users Posts: 834 ✭✭✭amor3


    Nothing at all apart from that I am registered and will be informed when they have a date for phase 2. They still have no brochure. Phase 1 is house no. 1-23


    They seem to be on house no. 18 or 19 from what I can make out. I'm gonna to walk by in the next few days and take a couple of photos.. the front row seem really close to the kiltipper rd and from the plans I thought that road had a front garden!



  • Registered Users Posts: 12 Hunterwise54


    I thought phase 1 was unit 1-26? It would be odd to leave 3 units off that row as phase 2.

    I thought that myself, the driveways seem to be small enough lenghtwise. Wont be much space between the Kiltipper road and the house front. Where unit 18/19 is, also seems very narrow to fit a driveway and a road to the front of the house. Maybe it will look different when everything is finished but hard to picture now.



  • Registered Users, Registered Users 2 Posts: 1,060 ✭✭✭SimonMaher


    I see the scaffolding has gone up for the "corner" house facing out on to Kiltipper Road which means a lot of Phase 1 is now in place. Lots of foundation and pipework sets done too for the next row. It's still surprisingly difficult to picture it completed - they really are making use of every square foot of space!

    Has anyone heard anything recently from Formation or the EA? I emailed him on Friday for an update but nothing at all back so far regarding Phase 2, brochures, plans or most importantly - prices!

    Simon



  • Registered Users Posts: 834 ✭✭✭amor3


    Nothing at all since the 19th of August. And that was to say he still had no information !

    Has anyone from phase 1 heard anything??



  • Registered Users Posts: 834 ✭✭✭amor3


    Was onto Paul again today, still nothing and he is not very pleasant with his emails.. just a basic "no update" really..


    In the meantime, I've had 2 emails after that today about viewings for others houses i had registered interest in!



  • Registered Users Posts: 12 Hunterwise54


    Could be another few weeks or months. Phase 1 was only meant to be 1-15 according to the advertisimg boards but they included more houses so phase 2 could be another while.

    Yes I see viewings are popping up for a few places, Graydon in Newcastle have showhouses this Saturday and the new development in Kilcarberry are launching the end of the month.



  • Registered Users Posts: 834 ✭✭✭amor3


    Yeah Graydon was one of the emails I got, I replied with an appointment request with 4 minutes of getting the email and got a reply today that all appointments are gone and I'll be contacted on the next release, when I asked about what sort of time frame that could be, I was told spring 22.



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    they are now finishing the show houses, I don't know exactly when phase 2 might be released, but I would say it will not until show houses is finished. so maybe after 1 month or so.



  • Registered Users Posts: 344 ✭✭dmn




  • Registered Users Posts: 101 ✭✭Ciara26


    Any idea on the price for 2 bed?



  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    Heey, 2 beds will be in the last (third) phase, so I would say it will be maybe around 1 year before they start release them, it's hard to guess/expect prices for them at the moment.



  • Registered Users Posts: 3 Ninghao


    Hey guys I am a new member and I have paid the deposit for a 4 bed detached. It is 525k. Anyone has any idea because It is quite strange because nowadays it seems that properties which haven't been built can be sold. Also, I want to know more details about the property but no way. hahaha. Hope we can meet next year!!!



  • Registered Users Posts: 3 Ninghao


    And I also want to ask about the surrounding of the estate. I am new in Dublin.......



  • Registered Users Posts: 12 Hunterwise54


    Hi Ninghao, congrats on the house. Did you purchase unit 27 from phase 2? I think 1-26 are phase 1. Yes you can buy properties from the plans before they are built, usually the case with new builds. The surrounding area is nice, good transport and near lots of schools and shops.

    Post edited by Hunterwise54 on


  • Registered Users Posts: 3 Ninghao


    Hey! I got No.26. So from your meaning 26 should be earlier than 27 because it is phase 1 right? Also is there any update about the finish date? I don't want to wait so long.....



  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    Congratulation, the tentative completion date that we have been told is Q1 2022



  • Advertisement
  • Registered Users Posts: 12 daithi_240


    Hi Ninghao congrats on the purchase do you know much about the area why did you end up buying up here? Are you planning on living in the area or renting out? Thanks.

    Post edited by daithi_240 on


  • Registered Users Posts: 16 Ria_12345


    Hi,

    Has anyone heard anything more on this development please? Is phase 1 fully completed?

    Many thanks



  • Registered Users Posts: 344 ✭✭dmn


    Hi. Phase 1 is not completed yet but is progressing very well. Looks like it’s just driveways and some finishing touches needed for some of phase 1.



  • Registered Users Posts: 834 ✭✭✭amor3


    Had a walk by this evening.. it seems like it is taking forever!! And the front row heading out onto the main road, garden/driveway is pretty tight as far as I can see!



  • Registered Users Posts: 834 ✭✭✭amor3




  • Registered Users Posts: 16 Ria_12345


    Hi, any more update on the above development please?



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 30 blackswanie


    Phase one is due to complete within few weeks, constructions also is started for phase 2 units, better to contact GVM if you are interesting in phase 2.



  • Registered Users Posts: 16 Ria_12345


    Hi,

    Do you know what's the story with flooring in this development please? Do you have to lay your own flooring?

    Many thanks



  • Registered Users, Registered Users 2 Posts: 30 blackswanie




  • Registered Users Posts: 16 Ria_12345


    Hi Everyone,

    Hope you are all well. Do you guys have any update on phase 1 please if completed?This will give an idea on when phase 2 will be coming?

    Thanks folks.



  • Registered Users Posts: 16 Ria_12345


    Hi,


    Sorry to bother you again. Just wondering if you have any update on phase 1 please if completed? This will give an idea on when phase 2 will be coming.


    Many thanks