List of costings

  • 06-03-2017 9:55am
    #1
    Registered Users, Registered Users 2 Posts: 244 ✭✭


    Hi, just in the process of buying a site to do a self build. I previously applied for a mortgage to buy a house but this seems to be a better option. To change the mortgage application they a looking for a list of estimated costings for the build. I was just wondering has anyone previously had to do this and how much detail must I go into with each cost.


Comments

  • Moderators, Society & Culture Moderators Posts: 40,337 Mod ✭✭✭✭Gumbo


    alan86 wrote: »
    Hi, just in the process of buying a site to do a self build. I previously applied for a mortgage to buy a house but this seems to be a better option. To change the mortgage application they a looking for a list of estimated costings for the build. I was just wondering has anyone previously had to do this and how much detail must I go into with each cost.

    Your Engineer/Architect/Surveyor needs to fill out, sign and stamp this form.


  • Registered Users, Registered Users 2 Posts: 244 ✭✭alan86


    kceire wrote: »
    Your Engineer/Architect/Surveyor needs to fill out, sign and stamp this form.

    Ok thanks. I was just wondering how much info I need for him like floor finishing and stuff or does he give a rough estimate on them


  • Moderators, Society & Culture Moderators Posts: 40,337 Mod ✭✭✭✭Gumbo


    alan86 wrote: »
    Ok thanks. I was just wondering how much info I need for him like floor finishing and stuff or does he give a rough estimate on them

    You'll need a finished price plus a contingency, in our case with Ulster Bank it was 15% contingency.