Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

How long to have UFH heating on b4 laying tiles?

  • 23-05-2013 12:13am
    #1
    Registered Users, Registered Users 2 Posts: 228 ✭✭


    Hi ... as per the subject header .... are there any guidelines on this ?
    Guy in shop was suggesting it would need to be on 3 weeks before tiling (screed will have been down almost 4 months by the time tiling starts) and to be fully cooled down before tiling starts.
    I thought using the flexi adhesive would mean no needs for the heating to be on for a few weeks in advance ???

    Cheers.


Comments

  • Registered Users, Registered Users 2 Posts: 405 ✭✭Innish_Rebel


    I have to 2nd what the shop says - heat on ramping up slowly over time to allow screed to dry and expand contract to final setting. Then tiling onto cold floors and after that you will be ramping up your UFH very very slowly.

    Last thing you want is cracked floor tiles - this is not the stage to rush things...


  • Registered Users, Registered Users 2 Posts: 228 ✭✭blast06


    Thanks. Need to start re-planning so !
    I had hoped that because my screed has been poured 3 months at this stage that i wouldn't have to wait 3 weeks .... but so be it !


  • Registered Users, Registered Users 2 Posts: 225 ✭✭K3v


    No need to wait 3 weeks. Just put them down using the flexi-adhesive and gradually bring up the floor temp.


  • Registered Users, Registered Users 2 Posts: 36 classic tiler


    blast06 wrote: »
    Hi ... as per the subject header .... are there any guidelines on this ?
    Guy in shop was suggesting it would need to be on 3 weeks before tiling (screed will have been down almost 4 months by the time tiling starts) and to be fully cooled down before tiling starts.
    I thought using the flexi adhesive would mean no needs for the heating to be on for a few weeks in advance ???

    Cheers.

    Provided your screed was laid properly and the correct materials was used, you need to leave the ufh off 24hrs before and after laying tiles and run at room temp for a day or 2 and you'll be fine.


Advertisement