Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Sutton to Sandycove Cycleway progress

  • 11-10-2007 1:56pm
    #1
    Closed Accounts Posts: 2,074 ✭✭✭


    DCC is inviting expressions of interest for a feasability study for a section of the proposed s2s cycleway
    DCC wrote:
    Expressions of Interest are invited for a Study which will examine the feasibility of providing an elevated combined promenade and cycleway on the seaward side of the existing James Larkin Road linking the North Bull Island Causeway and the Wooden Bridge at Dollymount, Dublin. If found to be feasible, an optimum scheme is to be identified and a preliminary design is to be developed.

    http://www.etenders.irlgov.ie/search/search_show.aspx?ID=MAY059669

    Additional news on the s2s website

    http://www.s2s.ie/
    Failed to load the poll.


Advertisement