Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all,
Vanilla are planning an update to the site on April 24th (next Wednesday). It is a major PHP8 update which is expected to boost performance across the site. The site will be down from 7pm and it is expected to take about an hour to complete. We appreciate your patience during the update.
Thanks all.

Swiftway BRT: Issues highlighted in public consultation

Options
1356

Comments

  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    I would imagine that with luas BXD, 5 radial BRT routes, a new two way cycle path along the quays and possibly DART underground that Dublin in the 2020's will be largely car free bar deliveries and some access to the city carparks on a restricted and congestion charged basis, possibly with a total ban during peak hours. The NTA/City council need to be brutal in handing over road space to BRT, this won't work while attempting to appease the motor industry at the same time. It's decision time, and short term populism has to go in order for the city to grow. The NTA has thus far proven it's self to be somewhat capable for a state agency. Let's hope they have the liathrodí to grab the required road space.


  • Registered Users Posts: 9,773 ✭✭✭antoinolachtnai


    Firstly, I agree with you that there are ways to make buses go faster on that corridor and all others. That should be done for sure. There are a bunch of ways this can be done, and most of the ones involving road space have already been done.

    The problem comes down to road space at the narrowest points on the road and more specifically to junction capacity. As it is, the space for private vehicles has already been reduced to one lane. You can't reduce it any further. Even if there were no private passenger cars commuting or shopping, you still need quite a lot of commercial traffic just to sustain a modern city (restocking, remove waste, alterations/construction/repairs, sales and so on), and this needs to be facilitated.

    There is a shortage of road space in the city centre in particular but also in the 'burbs and it limits the possibility for a BRT-style scheme, or for that matter an LRT. Rearranging the road space doesn't make any more of it. This is especially the case at junctions, where rearranging the space is likely to result in less road space rather than more (because pedestrian volumes require space of their own).

    Dublin city centre has its own problems and they are serious. It is no longer a national centre for shopping - people from outside the city now go to the outlying shopping centres rather than the city centre. The flaws with the study are that it deals with perceptions of relatively junior people in the retail business (store managers) and deals in a very odd way with outliers. It only surveys the shoppers who are actually in the city, not the ones who decided to go elsewhere.

    So that is all bad news. What would I suggest doing? I would proceed by corridor improvement schemes on every single corridor. Improving the modal share of buses on each corridor by 10 percentage points is feasible, and this would make an immense difference to journey speeds in the city centre. But if all the money is spent on one or two corridors, it may result in a 15 percent improvement on those two corridors, but this will only amount to a 1 or 2 percent improvement overall, and this will not make any real difference.

    (I actually doubt the Swords corridor can deliver much in terms of improved modal share, because the airport and swords are already better served than the BRT can serve them, and the suburbs between there and the city are not that densely populated. But a study would need to be done to find out. This could be done easily enough using census data, but it apparently has not been done.)


  • Registered Users Posts: 14,005 ✭✭✭✭AlekSmart


    cgcsb wrote: »
    I would imagine that with luas BXD, 5 radial BRT routes, a new two way cycle path along the quays and possibly DART underground that Dublin in the 2020's will be largely car free bar deliveries and some access to the city carparks on a restricted and congestion charged basis, possibly with a total ban during peak hours. The NTA/City council need to be brutal in handing over road space to BRT, this won't work while attempting to appease the motor industry at the same time. It's decision time, and short term populism has to go in order for the city to grow. The NTA has thus far proven it's self to be somewhat capable for a state agency. Let's hope they have the liathrodí to grab the required road space.

    This City Centre Car Parking issue is rumbling along with NO end in sight.

    These operations morphed from being "Bombsite"surface car parks,supervised by "Lockhards",to the significant business opportunities which exist today.

    Any attempt to restrict or eliminate access to City Centre Multi-Stories will be met with rapid,effective (and Expensive) opposition.

    AFAIR,a legal warning shot was fired across DCC's bows some years back,which was apparently of the highest risk in terms of potential cost to DCC compensation wise.

    Whether the NTA has the measure of the Multi-Story Operators remains to be seen ?


    Men, it has been well said, think in herds; it will be seen that they go mad in herds, while they only recover their senses slowly, and one by one.

    Charles Mackay (1812-1889)



  • Registered Users Posts: 4,905 ✭✭✭Aard


    With increased economic activity in the city centre, Kelleher's old Dawson Street building recently going for €23m, the MacNamara development on the Green going to be rented out at €450/sqm -- these are all signs that perhaps in the not-so-distant future it may make more sense for the carpark owners to tear them down and build Class A office buildings instead with limited underground parking for employees. Certainly if I was in ownership of a massive car park I'd be weighing up my options for redevelopment.


  • Moderators, Business & Finance Moderators, Motoring & Transport Moderators, Society & Culture Moderators Posts: 67,640 Mod ✭✭✭✭L1011


    Fair few of the city centre carparks are on constrained sites, entirely underground or on undesirable streets for office developments. Some may close, but consider that there's carparks in central London - others will just get dearer.


  • Advertisement
  • Closed Accounts Posts: 1,844 ✭✭✭Banjoxed


    AlekSmart wrote: »
    This City Centre Car Parking issue is rumbling along with NO end in sight.

    These operations morphed from being "Bombsite"surface car parks,supervised by "Lockhards",to the significant business opportunities which exist today.

    Any attempt to restrict or eliminate access to City Centre Multi-Stories will be met with rapid,effective (and Expensive) opposition.

    AFAIR,a legal warning shot was fired across DCC's bows some years back,which was apparently of the highest risk in terms of potential cost to DCC compensation wise.

    Whether the NTA has the measure of the Multi-Story Operators remains to be seen ?

    Sure wasn't it the case that Aer Rianta said primly "no thank you" to bringing rail to Dublin Airport because of its captive audience of travellers parking their cars there? Easy for lobbyists to monetise car drivers and traffic congestion.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    The problem comes down to road space at the narrowest points on the road and more specifically to junction capacity. As it is, the space for private vehicles has already been reduced to one lane. You can't reduce it any further. Even if there were no private passenger cars commuting or shopping, you still need quite a lot of commercial traffic just to sustain a modern city (restocking, remove waste, alterations/construction/repairs, sales and so on), and this needs to be facilitated.

    A big problem along existing bus corridors is sharing road space between bus and cars particularly for left turning movements. This can be done without removing forther road space from private cars.
    Dublin city centre has its own problems and they are serious. It is no longer a national centre for shopping - people from outside the city now go to the outlying shopping centres rather than the city centre. The flaws with the study are that it deals with perceptions of relatively junior people in the retail business (store managers) and deals in a very odd way with outliers. It only surveys the shoppers who are actually in the city, not the ones who decided to go elsewhere.

    Footfall in city centre is increasing steadily. I don't know where you are getting the idea that the suburban centres are hoovering up all the custom.
    (I actually doubt the Swords corridor can deliver much in terms of improved modal share, because the airport and swords are already better served than the BRT can serve them.

    I agree that there is little scope for journey time improvement along the corridor with the exception of the cat and cage road widening (which is being done anyway). Perhaps an elaborate bus only by-pass of Santry village can also offer some journey time improvement. However there is plenty of scope for overall improvement of service. The airport services are piss poor. You can get a 16 which meanders through the burbs before getting to the airport and you have the horribly infrequent 41. These services are kept piss poor deliberately because DC are trying to flog their rip off €6 each way 'airport express' which takes more than an hour end to end.
    and the suburbs between there and the city are not that densely populated.

    I'm afraid you are talking out your yazoo there. The Drumcondra/whitehall/Santry/Swords corridor is densley populated, that is why it was selected for a metro line and that is why the NTA have deemed that BRT is incapable of meeting the demand of that corridor.
    But a study would need to be done to find out. This could be done easily enough using census data, but it apparently has not been done.)
    This has been done.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    The car parking is a conundrum alright. I think many of them will eventually disappear over time. Jervis Street, Ilac and Brown Thomas could be more profitable as offices. Also DCC could decide that those endless signs around town, pointing you towards car parks and telling us how many spaces there are, are no longer required and are contributing to visual clutter/pollution. Throw in a congestion charge and the car parks will start to die of natural causes.


  • Moderators, Motoring & Transport Moderators Posts: 14,072 Mod ✭✭✭✭monument


    cgcsb wrote: »
    The car parking is a conundrum alright. I think many of them will eventually disappear over time. Jervis Street, Ilac and Brown Thomas could be more profitable as offices. Also DCC could decide that those endless signs around town, pointing you towards car parks and telling us how many spaces there are, are no longer required and are contributing to visual clutter/pollution. Throw in a congestion charge and the car parks will start to die of natural causes.

    Amsterdam city centre has far more restricted streets, yet it has car parks like Dublin's.

    The death of car parks has been predicted before and I'm sure it will be predicted again.
    Firstly, I agree with you that there are ways to make buses go faster on that corridor and all others. That should be done for sure. There are a bunch of ways this can be done, and most of the ones involving road space have already been done.

    The problem comes down to road space at the narrowest points on the road and more specifically to junction capacity. As it is, the space for private vehicles has already been reduced to one lane. You can't reduce it any further. Even if there were no private passenger cars commuting or shopping, you still need quite a lot of commercial traffic just to sustain a modern city (restocking, remove waste, alterations/construction/repairs, sales and so on), and this needs to be facilitated.

    Northbound there's, for example, missing sections of bus lane:
    • 300 meters -- between the Royal Canal and just after the junction with Cloniffe Road
    • 290 meters -- between Hollybank Rd to Millbourne Ave
    • etc


    Rearranging the road space doesn't make any more of it. This is especially the case at junctions, where rearranging the space is likely to result in less road space rather than more (because pedestrian volumes require space of their own).

    No rearranging road space does not make more of it -- it re-prioritises road space to the modes which can carry more people.

    Dublin city centre has its own problems and they are serious. It is no longer a national centre for shopping - people from outside the city now go to the outlying shopping centres rather than the city centre.

    The death of the city centre is greatly exaggerated.

    Sure, it's no longer the national centre of shopping that it once was. But that's so for many reasons -- one of them is the boom in selection elsewhere, away from the East of the country. I know around my home area, Galway can now largely rival a lot of the selection Dublin had, Sligo does so to a lesser extent, and even in Castlebar there's shops which most people would have ever expected in Mayo. Online shopping has also changed things. Lots of things have changed.

    But it's not doom and gloom for Dublin City Centre. The population of Dublin City and the Greater Dublin Area has also boomed. And many people the region and from all over the country still shop in Dublin City Centre.

    The city centre has also built up some stores -- both large and small, both independent local and large international -- that are not in out-of-town centre or in other cities. While these may not pull in as many people from around the country as used to be pulled in, these shops are a pull factor for many in the Greater Dublin Area, which is set to grow in population terms.

    The flaws with the study are that it deals with perceptions of relatively junior people in the retail business (store managers) and deals in a very odd way with outliers. It only surveys the shoppers who are actually in the city, not the ones who decided to go elsewhere.

    It far from just deals with perceptions of junior mangers -- we've heard the heads of retailers overestimating the amount of shoppers who are traveling by car, as well as overvaluing the positive effect of Luas.

    But if all the money is spent on one or two corridors, it may result in a 15 percent improvement on those two corridors, but this will only amount to a 1 or 2 percent improvement overall, and this will not make any real difference.

    BRT is effectually dealing with five corridors, not one or two.

    (I actually doubt the Swords corridor can deliver much in terms of improved modal share, because the airport and swords are already better served than the BRT can serve them, and the suburbs between there and the city are not that densely populated. But a study would need to be done to find out. This could be done easily enough using census data, but it apparently has not been done.)

    Overall the Swords - City Centre corridor looks to be more densely populated than the corridor severby the Luas green line.

    The NTA now has so much population, trip and traffic research that it makes planning in the past look like it was stone age based. I don't think you can accuse them of not doing their homework!


  • Registered Users Posts: 9,773 ✭✭✭antoinolachtnai


    If they have done the homework, where is it? Saying that it is possible to get from swords to the city centre and back in 70 minutes is not homework. It is just bald assertion and politicking.

    Will adding extra lengths of bus lane actually make much difference to bus speeds? To achieve what NTA promise, BRT would have to double the current speed and be almost as fast as the Luas green line.

    The Ballymun density for the km either side of the corridor looks a lot higher to me, looking at the map. Is there a study?

    The reason Metro North was proposed to go via Drumcondra to Swords had little enough to do with the density of the population there.

    I am not saying that bus priority is not a good thing, just that it has to be applied realistically and pragmatically.

    The biggest thing we need to bring about modal shift is more buses at a lower cost.


  • Advertisement
  • Registered Users Posts: 6,703 ✭✭✭Pete_Cavan


    The best way to deal with car parks is to tackle the problem at source and target their customers by making it so difficult to drive into the city that people just wont bother. The first thing and a no brainer would be to extend the bus gate from the top of O'Connell Street to Dame Street/Georges Street junction and Pearse Street/Tara Street junction operated 24 hours and enforced by CCTV cameras and issuing fines to drivers. This of course would be beneficial to the vast majority of people in the city. The problem is that the powers that be wont listen to the majority and instead bend to the will of a small number of vested interests who are happy to see the city streets clogged with traffic so they can charge them ridiculous prices to park. Any direct attack on car parks will be met with serious resistance so it has to be done indirectly.

    As regards BRT, sharing with normal buses wont work as journey times will not be reduced because they will only be as fast as the slowest service using the lane. The choice is either have BRT only on the selected routes with DB buses feeding these (so BRT only along Drumcondra Road with DB using other roads but interchanging with the BRT at Collins Ave, Griffith Ave, etc.) or else upgrade DB to include some of the characteristics of BRT (mainly off board ticketing and a reduced number of stops). In either case, the services will be undermined by other traffic as full segregation is not possible. What we need (right now, not just if they want to introduce BRT) is a system whereby bus drivers can report people obstructing their lane, either reporting directly to Gardai or to their own dedicated division who can deal with these issues. If a bus driver finds his lane obstructed, he radios in the location and a lorry is available to come immediately to remove the obstruction and a hefty fine is issued to the owner. Cameras on the front of the bus would record the licence plate of the car should it have moved in the meantime. This is particularly important for taxi drivers who think

    Also, certain bus lanes need to be in operation 7 days a week and for longer each day. In certain places the bus lane becomes a car park after a certain time and off peak services are not much faster than at peak times, for example Dorset Street and Amien Street. It is not the 60's anymore, the city doesnt shut down at 7pm and people need to get around the city on a Sunday.


  • Moderators, Motoring & Transport Moderators Posts: 14,072 Mod ✭✭✭✭monument


    If they have done the homework, where is it? Saying that it is possible to get from swords to the city centre and back in 70 minutes is not homework. It is just bald assertion and politicking.

    In the context of general population, trip and traffic research, here's their homework:

    http://www.nationaltransport.ie/publications/transport-planning/
    http://www.nationaltransport.ie/publications/transport-planning/draft-transport-strategy-background-documents/


    Will adding extra lengths of bus lane actually make much difference to bus speeds? To achieve what NTA promise, BRT would have to double the current speed and be almost as fast as the Luas green line.
    The Ballymun density for the km either side of the corridor looks a lot higher to me, looking at the map. Is there a study?

    It is, but the ghost of Metro North has not given up yet.

    The Swords BRT route has higher density than a lot of the Luas Green Line.

    The bulk of Northwood -- with CSO Small Areas which have ~10-24 persons per SQKM -- is about as close to the Swords Road as it is to the planned Metro North stop in the far corner of the Northwood campus.


    The reason Metro North was proposed to go via Drumcondra to Swords had little enough to do with the density of the population there.

    You could be getting at many things, but the area has both good density and more than its fare share of trip generators. You claim that "the suburbs between there and the city are not that densely populate" is just not that true.

    Look at the overall picture inside the M50 -- we can't select the persons per SQKM measure for the exact catchment area as that would not match Electoral Divisions, but we can look at the Electoral Divisions connected to the routes to get an idea...

    There's a perception that these are low density, but this is not true expect for the area which includes the fields around DCU.

    With the Swords BRT route it works out as follows:
    • Average between M50 and canal: 5,000 persons per SQKM
    • Average inside M50: 10,000 persons per SQKM
    That compares well to the Luas Green Line area inside the M50:
    • Average between M50 and canal: 6,300
    • Average inside M50: 8,500

    That compares well to the overall average density in Amsterdam (4,908/km2), a comparable city population wise and one which has a load of tram lines and a few metro lines.


    For the record, here's the full data I worked off:
    Swords BRT

    Turnapin -- 1,790.4 persons per SQKM (~50%+ business / motorway)
    Kilmore A -- 4,551.9 persons per SQKM
    Whitehall C -- 3,006.8 persons per SQKM (includes Omni Park, other businesses)
    Whitehall B -- 5,189.3 persons per SQKM (goes from the Ballymun Road to Swords, with some unfinished apartment developments in middle)
    Whitehall D -- 4,242.6 persons per SQKM
    Whitehall A -- 2,706.1 persons per SQKM (includes DCU and a few fields)
    Drumcondra South C -- 4,254.7 persons per SQKM
    Drumcondra South A -- 4,437.9 persons per SQKM
    Botanic B -- 6,661.2 persons per SQKM
    Drumcondra South B -- 4,488.2 persons per SQKM
    Ballybough B -- 9,568.6 persons per SQKM (includes areas on both sides of the canal)
    Inns Quay A -- 12,346.9 persons per SQKM
    Mountjoy B -- 12,418.2 persons per SQKM
    Rotunda A -- 18,792 persons per SQKM
    Mountjoy A -- 17,753.3 persons per SQKM
    North City -- 9,544.6 persons per SQKM
    North Dock C -- 7,241.7 persons per SQKM
    Mansion House A -- 6,488.1 persons per SQKM
    Mansion House B -- 1,662.5 persons per SQKM
    St. Kevin's -- 7,919.4 persons per SQKM

    Luas Green Line:

    Stillorgan-Leopardstown -- 4,261.4 persons per SQKM
    Stillorgan-Merville -- 2,450 persons per SQKM
    Dundrum-Balally -- 2,797.2 persons per SQKM (includes Sandyford Business Park)
    Stillorgan-Kilmacud -- 4,206.6 persons per SQKM
    Dundrum-Kilmacud -- 3,512.1 persons per SQKM
    Dundrum-Taney -- 4,296.5 persons per SQKM
    Churchtown-Woodlawn -- 3,375.6 persons per SQKM
    Clonskeagh-Farranboley -- 4,169.4 persons per SQKM
    Churchtown-Orwell --1,888.4 persons per SQKM (golf club)
    Rathmines East B -- 4,426.4 persons per SQKM
    Rathmines East C -- 4,584.9 persons per SQKM
    Rathmines East D -- 7,563.9 persons per SQKM
    Rathmines East A -- 6,715.9 persons per SQKM
    St. Kevin's -- 7,919.4 persons per SQKM
    Royal Exchange B -- 8,700 persons per SQKM
    Mansion House B -- 1,662.5 persons per SQKM

    And if BRT's pull works anyway like Luas you can expect notable amounts of people walking or cycling further than the traditional catchment area.


  • Registered Users Posts: 17,542 ✭✭✭✭LXFlyer


    monument wrote: »
    BRT is effectually dealing with five corridors, not one or two.

    While I think the Swords and N11 corridors are good candidates for BRT, and possibly Blanchardstown, I remain totally unconvinced about the Malahide Road and Rathfarnham routes due to there being insufficient road space for two BRT/bus lanes and two normal traffic lanes for substantial portions of each route.

    Without widespread CPOs being instigated, I cannot see it working, and the number of CPOs that would be required I just cannot see being acceptable.


  • Registered Users Posts: 1,419 ✭✭✭Cool Mo D


    lxflyer wrote: »
    While I think the Swords and N11 corridors are good candidates for BRT, and possibly Blanchardstown, I remain totally unconvinced about the Malahide Road and Rathfarnham routes due to there being insufficient road space for two BRT/bus lanes and two normal traffic lanes for substantial portions of each route.

    Without widespread CPOs being instigated, I cannot see it working, and the number of CPOs that would be required I just cannot see being acceptable.

    Where is the problem with the Malahide road? It's already continuous bus line almost the entire way from Fairview to Clongriffin, minus about 100 metres in Artane and Marino.


  • Registered Users Posts: 17,542 ✭✭✭✭LXFlyer


    Cool Mo D wrote: »
    Where is the problem with the Malahide road? It's already continuous bus line almost the entire way from Fairview to Clongriffin, minus about 100 metres in Artane and Marino.



    The stretch from Fairview to Griffith Avenue is only bus lane on one side of the road and just beyond Kilmore Road - totalling about 700m.


    Without CPO'ing every front garden it's going to be difficult to put in full BRT.


  • Closed Accounts Posts: 1,844 ✭✭✭Banjoxed


    lxflyer wrote: »
    The stretch from Fairview to Griffith Avenue is only bus lane on one side of the road and just beyond Kilmore Road - totalling about 700m.


    Without CPO'ing every front garden it's going to be difficult to put in full BRT.

    And therein is the heart of the problem. It may well be called BRT, but the danger will be that at pinch points it will be far from rapid.

    Still, the Indo and the Irish Daily Mail will marvel at the sexy buses.


  • Registered Users Posts: 9,773 ✭✭✭antoinolachtnai


    To get the big gains, you don't have to have exclusivity for every inch of the way. The most critical thing is getting to the front at junctions.

    The practical job of the traffic engineer is to do this with as little disruption as possible. It is the space at the junctions that is critical.

    That said, you will not get the metro-like speeds that NTA are holding out without a dedicated busway, from which non-BRT buses are excluded.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    There isnt any serious constraint on the malahide rd corridor except for a small section near Fairview. I'd be more worried about the blanch and tallaght routes.


  • Registered Users Posts: 33 Cinephille1888


    I was speaking to a DIT lecturer of mine about it, as I shared a draft submission I intend to hand in to the NTA.

    He told me that at a recent BRT conference the Head of the NTA said they were going full steam with this project, and the other routes.

    He also said that the NTA "put the shutters" on the idea of Metro North happening any time soon. And that BRT was the future for transport improvements, for some time to come.

    There is also the "north Dublin transport option review" which is due in Jan/Feb. This may include Luas Expansion, Swiftway, Maynooth Electrification, Ballymun QBC to the Airport, and possible new corridors identified.

    The Submission date is next week for those still interested.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    How extremely frustrating for Dubliners. Swiftway 2.0 + a curvatious extension of BXD that'll have a journey time exceeding existing services. Why is there such a resistance to building proper high capacity infrastructure, that'll secure our transport needs into the future?


  • Advertisement
  • Registered Users Posts: 5,606 ✭✭✭schemingbohemia


    cgcsb wrote: »
    How extremely frustrating for Dubliners. Swiftway 2.0 + a curvatious extension of BXD that'll have a journey time exceeding existing services. Why is there such a resistance to building proper high capacity infrastructure, that'll secure our transport needs into the future?

    Eh, I'm guessing it's money related. We're still broke.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    Eh, I'm guessing it's money related. We're still broke.

    There was ample money in the coffers from 1995-2008. A period in which, hospitals, schools and railways just got rustier and more decrepit.


  • Closed Accounts Posts: 4,057 ✭✭✭Tragedy


    cgcsb wrote: »
    There was ample money in the coffers from 1995-2008. A period in which, hospitals, schools and railways just got rustier and more decrepit.

    A huge amount of money was spent on schools and hospitals in the last decade, as well as transport infrastructure. Railway spending isn't particularly low, CIE is just utterly inept and mismanaged.


  • Registered Users Posts: 8,740 ✭✭✭SeanW


    Eh, I'm guessing it's money related. We're still broke.
    Then why bother?


  • Registered Users Posts: 17,542 ✭✭✭✭LXFlyer


    Just as a reminder, deadline for submissions on the Swords BRT plans is this Friday at 5pm.

    Details at http://www.nationaltransport.ie/consultations/public-consultation-on-swiftway-bus-rapid-transit-swordsairport-to-city-centre/


  • Registered Users Posts: 453 ✭✭pclive


    At a recent conferecne on the BRT the planners were asked if taxis were to be allowed to use the BRT lanes.

    His answer was they they havent decided yet.

    I think the wole project will fail if they are allowed to access BRT lanes.


  • Moderators, Motoring & Transport Moderators Posts: 14,072 Mod ✭✭✭✭monument


    pclive wrote: »
    I think the wole project will fail if they are allowed to access BRT lanes.

    If there's decent priorty (which is lacking in places right now), taxes won't matter as much as you might think.


  • Registered Users Posts: 9,273 ✭✭✭cgcsb


    Taxis will definitely impact in central areas as will sharing the bus lane with left turners. The buslane on the quays is congested in the mornings, only its not buses blocking it, its taxis, left turners and illegal parkers.

    If BRT routes have the same poorly segregated road space then there's no point in claiming that brt represents any time saving for commuters, its simply not true. Without vastly improved segregation, all we're getting is bendy buses.


  • Registered Users Posts: 453 ✭✭pclive


    And not to mention non existant enforcement of existing bus lanes


  • Advertisement
  • Registered Users Posts: 314 ✭✭Kumsheen


    pclive wrote: »
    At a recent conferecne on the BRT the planners were asked if taxis were to be allowed to use the BRT lanes.

    His answer was they they havent decided yet.

    I think the wole project will fail if they are allowed to access BRT lanes.

    I'd bet money they will be allowed to use them, and they will stop in them too as they currently do.


Advertisement