Conservatory Ceiling

Hi,

I'm thinking of putting up a wooden ceiling in my conservatory. The floor size of room is 5.6m x 4.1m with the ceiling angling up on three sides.

Has anyone any experience of this and the cost involved (labour and materials) or what type of wood i should use?

Thanks
Huge E is offline  
Advertisement
10-11-2010, 14:26   #2
Vain
Registered User
 
Vain's Avatar
 
Join Date: Feb 2007
Location: Over There
Posts: 2,307
Send a message via MSN to Vain
Hi, will first off you will have to measure the roof and get the area of the 3 sides the floor area will be different so thats no good to you. Most people use T&G boards of some sort. I have no idea on cost.
Vain is offline  
10-11-2010, 14:41   #3
Huge E
Registered User
 
Join Date: Nov 2010
Posts: 2
Thanks for the respinse.

The area is circa 24sqm
Huge E is offline  
10-11-2010, 20:32   #4
ronaldo84
Registered User
 
Join Date: Jul 2010
Location: mayo
Posts: 191
TGV and TGB are popular in conservertory ceilings and can be done with lots of designs and centre pieces. u could also do a trough around the bottom with rope lighting. u could also make up trusses or beams, i would prefinish all boarding and mouldings before fitting. insulate and ply out the ceiling. boarding should be secret nailed with 18 guage brad gun. u will need scaffolding also. it is hard to say how much it would cost unless u know exactly what u want.
ronaldo84 is offline  
15-11-2010, 22:23   #5
LCW
Registered User
 
Join Date: Nov 2010
Posts: 1
Shane

Hi Huge E

I just complete a conservatory to sunroom conversation for a friend of mine. I put insulated silver foil under the glass on the inside. Really good job as you then don't see the framing etc for the TGV from outside. Also looks well. Have to say it was a slower job then i though taking 9 full days on my own. Slow job hiding all the nails with a lot of angle cuts. Even with all the right tools and a big van to get the material.

On the price it cost about 900 euro in material (framing insulation and quality TG) I also made my own beading.

I actually have some pictures of it on my website

http://lcw.ie/Main/Sun_room.html

Hope that helps.
LCW is offline  
Advertisement
27-11-2010, 00:24   #6
Quiet you
Registered User
 
Quiet you's Avatar
 
Join Date: Sep 2010
Posts: 391
You won't get better advice then the previous two posts. A mobile scaffold (on lockable wheels) can be rented for relativly cheap and its easily moved so no setting up, taking down and repeating. Just set it up the once and you're done. Pre - finishing the boards is the way to go too. Its a much cleaner job in the end.

P.S. LCW, very nice job.
Quiet you is offline  
30-11-2010, 00:36   #7
dubtom
Registered User
 
dubtom's Avatar
 
Join Date: Sep 2005
Location: ehh..thing.
Posts: 3,008
Class Job LCW
dubtom is offline  
Post Reply

Quick Reply
Message:
Remove Text Formatting
Bold
Italic
Underline

Insert Image
Wrap [QUOTE] tags around selected text
 
Decrease Size
Increase Size
Please sign up or log in to join the discussion

Thread Tools Search this Thread
Search this Thread:

Advanced Search



Share Tweet